Battery storage cost

This page explains what drives battery storage costs and gives you an estimated range from the same questions a contractor would ask. It is an estimate, not a quotation — the actual price depends on site-specific factors.

Last updated 22 Sept 2026

What battery storage work involves

Home battery storage stores electricity — from your own solar generation or from a cheap overnight tariff — and releases it when you would otherwise be importing at a higher rate. It is fitted alongside the consumer unit, with either a hybrid inverter or an AC-coupled unit.

Battery costs depend on usable capacity, inverter compatibility and installation complexity.

Estimate your battery storage cost

Most battery storage projects we hold cost data for fall between £4,500 and £7,000. 10kWh home unit

The estimator for this service isn't available yet.

Estimated range only. The actual price depends on site-specific factors such as access, condition and specification.

What changes the price

Usable capacity
Priced largely by usable kWh. The usable figure matters more than the headline capacity.
Inverter arrangement
Hybrid inverters replace an existing solar inverter; AC-coupled units sit alongside it. The two routes cost differently.
Existing solar
Retrofitting to an existing array may mean changing the inverter or adding metering.
Location and mounting
Garage, loft and utility installs differ in cabling, ventilation and mounting work.
Backup supply
Whole-house or partial backup during a power cut needs extra switching and costs more.

What a contractor will ask about your property

  • Do you already have solar, and if so what inverter is fitted?
  • What is your typical daily electricity use?
  • Are you on, or able to move to, a time-of-use tariff?
  • Where could the battery be mounted?
  • Do you want backup during a power cut?

How a project usually runs

  1. 1

    Assessment

    Usage, tariff and existing electrics reviewed.

  2. 2

    Design

    Capacity, inverter route and mounting position agreed.

  3. 3

    Install and commission

    Battery mounted, wired, tested and configured; grid paperwork submitted.

Permissions and regulations

  • The installation is notifiable electrical work and should be certified.
  • Storage capacity may need to be declared to the network operator alongside any generation.

When you need a specialist

  • Where the consumer unit is at capacity, an electrician should review it first.
  • Where solar is being installed at the same time, design both together rather than in sequence.

Related services

Common questions

Can I add a battery to existing solar?

Usually yes. Whether the existing inverter is reused, replaced or supplemented is the main decision, and it affects the price.

Will a battery keep my house running in a power cut?

Only if backup is specified. Standard installations shut down with the grid for safety.

How long do batteries last?

Manufacturers publish warranty terms in years and in throughput. Compare both rather than the headline number alone.